The Construction Site For The Metro C

ROME, ITALY - DECEMBER 27: The mole digging inside the construction site for the extension of Line C of the Rome Metro, along the section that will connect the future Amba-Aradam station to the one, still to be reached, of Piazza Venezia on December 27, 2019 in Rome, Italy. The route reaches a maximum depth of 57 metres. The two moles are currently at the height of San Pietro in Carcere and are continuing to dig the last 150 meters that separate them from the final finish line di piazza Venezia. The Amba-Aradam metro station will open in 2024. (Photo by Stefano Montesi - Corbis/ Getty Images)
ROME, ITALY - DECEMBER 27: The mole digging inside the construction site for the extension of Line C of the Rome Metro, along the section that will connect the future Amba-Aradam station to the one, still to be reached, of Piazza Venezia on December 27, 2019 in Rome, Italy. The route reaches a maximum depth of 57 metres. The two moles are currently at the height of San Pietro in Carcere and are continuing to dig the last 150 meters that separate them from the final finish line di piazza Venezia. The Amba-Aradam metro station will open in 2024. (Photo by Stefano Montesi - Corbis/ Getty Images)
The Construction Site For The Metro C
PURCHASE A LICENCE
How can I use this image?
475.00 €
EUR

DETAILS

Restrictions:
Contact your local office for all commercial or promotional uses.
Credit:
Editorial #:
1190613525
Collection:
Corbis News
Date created:
27 December, 2019
Upload date:
Licence type:
Release info:
Not released. More information
Source:
Corbis News
Object name:
cantiere_metroc27.jpg
Max file size:
7360 x 4912 px (62.31 x 41.59 cm) - 300 dpi - 25 MB